| Significant Projects |
|
|
- Tunnelling and Mining Projects
- The Cooranbong/Mandalong Colliery Survey
- Awaiting Information from RJH
- Dendrobium Mine Project
- The Dendrobium Mine Project was completed in October, 2002. This project comprised Gyro Survey of Mine Baselines Surface and underground at Billiton Dendrobium Mine, Unanderra. Ref: 14491
- Upgrade of Mine Baseline at Westside
- The Upgrade of Mine Baseline at Westside was completed in November, 2001. This project comprised placement of survey control marks for future mine development at Westside Open Cut Mine. Ref: 14131
- Lemington Mine Project
- The Lemington Mine Project was completed in June, 1996. This project comprised GPS Control Survey and monumentation on 12 Ground Control Points. Ref: 12001
- Boulder Bay Ocean Outfall Tunnel Project
- The Boulder Bay Ocean Outfall Tunnel Project was completed in March, 1996. This project comprised a survey of easement acquisition of tunnel, Sewer Main and access. Ref: 11895
- Technical Support
- Mine Hunter Project
- The Mine Hunter Project was completed in March, 1996. This project comprised using 3 GPS receivers at Carrington to establish 3 Positional Points. Ref: 11976
- Blue Circle Cement Works, Berina
- Photogrammetric Mapping Control
- Rutherford Flood Mapping Project
- The Rutherford Flood Mapping Project was completed in 2004. This project comprised of a Control Survey. Ref: N/A
- Hunter Valley Project, North Rothbury
- The Hunter Valley Project, North Rothbury was completed in July, 2003. This project comprised a GPS survey to place 21 photo control targets recording their co-ordinates (ISG) and heights (AHD). Ref: 14592
- Bell Bird Project
- The Bell Bird Project was completed in December, 2001. This project comprised a GPS survey to establish 10 photo control co-ordinates (ISG) and heights (AHD). Ref: 14151
- Ground Points at Upper Allyn
- The Ground Points at Upper Allyn were completed in August, 2001. This project comprised a GPS survey to establish 5 ground points for photo control. Ref: 14032
- Cardiff Mapping Project
- The Cardiff Mapping Project was completed in December, 2000. This project comprised a GPS survey to establish 6 photo control co-ordinates (ISG) and heights (AHD) and supply control information. Ref: 13775
- Rail Services Australia GPS Project
- The Rail Services Australia GPS Project was completed in December, 1998. This project comprised a GPS survey and conventional survey to establish 7 photo control co-ordinates (ISG) and heights (AHD) in the Singleton area. Ref: 13103
- Pelton Colliery GPS Project
- The Pelton Colliery GPS Project was completed in November, 1998. This project comprised a GPS survey using 3 Leica System 300 GPS receivers and an EL22 as a base station to establish 7 photo control points in the Pelton Colliery area. Ref: 13030
- Cessnock GPS Survey Project
- The Cessnock GPS Survey Project was completed in June, 1998. This project comprised a GPS survey using Leica System 300 GPS equipment to establish 8 photo control points for proposed waste disposal site near Cessnock. Ref: 12943
- Photo Control Assignment at Great Lakes Shire
- The Photo Control Assignment at Great Lakes Shire was completed in May, 1998. This project comprised a GPS survey using 3 Wild System 300 GPS Receivers to establish 10 photo control points. Ref: 12912
- Jenolen Caves Photo Control Project
- The Jeolen Caves Photo Control Project was completed in November, 1997. This project comprised a GPS survey to establish 8 photo control co-ordinates (ISG) and heights (AHD) and 1 azimuth point at Jenolen. Ref: 12710
- Mount Arthur North Photo Control Project
- The Mount Arthur North Photo Control Project was completed in May, 1997. This project comprised a GPS survey to establish 16 photo control co-ordinates (ISG) and heights (AHD) using 3 Leica GPS Receivers near Muswellbrook. Ref: 12488
- Bengalla Mine Project
- The Bengalla Mine Project was completed in April, 1997. This project comprised Real Time GPS survey equipment to provide photo control co-ordinates (ISG) and heights (AHD) at the Bengalla Coal Mine south west of Muswellbrook. A list of vegetation heights at each control point was also supplied. Ref: 12400
- GPS Survey within the Orange Area
- The GPS Survey within The Orange Area was completed in December, 1996. This project comprised establishing co-ordinates (ISG) and heights (AHD) on 6 target points in Windeyer and 4 target points in Cargo, located between Orange and Mudgee using GPS Survey technology. Ref: 12322
- GPS Data Collection at Paterson River
- The GPS Data Collection at Paterson River was completed in September, 1996. This project comprised establishing co-ordinates (ISG) and heights (AHD) on 4 photo control points, surveying cross sections of the Paterson River Levees and Western Flood plain and historic flood markers. Ref: 12123
- Mapping Project at Newstan
- The Mapping Project at Newstan was completed in May, 1996. This project comprised establishing co-ordinates (ISG) and heights (AHD) on control points from photo control points established for photogrammetric mapping. Ref: 11929
- Patterson River Flood Study Project
- The Patterson River Flood Study Project was completed in April, 1996. This project comprised establishing co-ordinates (ISG) and heights (AHD) of 18 control points in the Hilton, Patterson, Seaham area. Ref: 12028
- Construction
- Salamander Bay Education Complex Project
- The Salamander Bay Education Complex Project was completed in July, 1998. This project comprised detail survey, setting out for construction and Schools/TAFE data capture to DPW&S specifications. Ref: 12342
- Greenhills Shopping Centre Project
- The Greenhills Shopping Centre Project was completed in May, 1998. This project comprised detail contour surveys for Flood Study and Redevelopment. Ref: 12131
- Centro
- Set out of Grid and level of a 6 storey concrete panel office building that will be completed in 2007 Ref: 15426
- General Surveys
- Schools Data Capture Project
- The Schools Data Capture Project is an ongoing project. Carried out for the NSW Department of Commerce (and its predecessor the NSW Department of Works & Services) on behalf of the NSW Department of Education and Training. Initially involving about 90 High Schools in the Hunter, Western and Northern Region schools we have visited exceed 200. Ref: 12544
- Kidsafe House at John Hunter Hospital
- The Kidsafe House at John Hunter Hospital was completed in February, 1997. This project comprised detail survey for design and subdivision. Ref: 12082
- Lakes Anglican Grammar School, Gwandalan Project
- The Lakes Anglican Grammar School, Gwandalan Project was completed in January, 1997. This project comprised detail survey, contour surveys and engineering survey for the construction and reconstruction of roads. Ref: 12344
- BOMA Measurement Project
- The BOMA Measurement Project was completed in March, 1996. This project comprised establishing the Net Lettable Area (NLA) of a commercial building as Wharf Road Newcastle using the BOMA method of measurement. Ref: 11991
- Subdivision and Boundary Surveys
- Maroba Nursing Home Project
- The Maroba Nursing Home Project was completed in August, 2000. This project comprised a Detail Survey, Contour Survey, Land Survey for Crown Grant, Engineering Survey and Design for proposed new road. Ref: 11870
- Windale North Western Precinct Neighborhood Improvement Program
- The Windale North Western Precinct Neighborhood Improvement Program was completed in December, 1999. This project comprised the orderly redevelopment of existing dwellings, Town Planning, Engineering Survey and Subdivision. Ref: 12296
- Windale Northern Precinct Neighborhood Improvement Program
- The Windale Northern Precinct Neighborhood Improvement Program was completed in June, 1998. This project comprised the orderly redevelopment of existing dwellings, Town Planning, Engineering Survey and Subdivision of 85 Lots. Ref: 12229
- Subdivision of BHP's Land
- The Subdivision of BHP's Land was completed in April, 1998. This project comprised the design and survey work associated with the 4 Lot subdivision on Crebert Street, Mayfield. Ref: 12239
- Kidsafe House at John Hunter Hospital
- The Kidsafe House at John Hunter Hospital was completed in February, 1997. This project comprised detail survey for design and subdivision. Ref: 12082
- Port Waratah Locomotive Trip Servicing Facility
- The Port Waratah Locomotive Trip Servicing Facility was completed in April, 1996. This project comprised a detail survey and boundary survey to set out the proposed Locomotive maintenance facility. Ref: 11867
- Transmission Line Surveys
- 11 kV Underground Cable at Edgeworth
- The 11 kV Underground Cable at Edgeworth was completed in August, 2003. This project comprised proposed instillation of a 11 kV Underground Cable through Council Owned Lands at Edgeworth. Ref: 14803
- 33 kV Transmission Line Easements at Cooranbong
- The 33 kV Transmission Line Easements at Cooranbong were completed in January, 2000. This project comprised surveying the existing 33 kV Transmission Line from Great Northern Railway approximately 1.5 kilometers and from Hawkemount Road approximately 1.5 kilometers. Ref: 13489
- Transmission Line Easements at Quorrobolong
- The Transmission Line Easements at Quorrobolong were completed in January, 1999. This project comprised survey and plan preparation over existing Transmission lines on the Quorrobolong Map Area Sheet. Ref: 12527
- Roads and Drainage
- Road Boundaries - Anna Bay Project
- The Road Boundaries - Anna Bay Project was completed in July, 2002. This project comprised locating the Road Shoulder in relation to Road Boundaries and Search Property Owners on North West Side of Nelson Bay Road, Anna Bay. Ref: 14393
- Westside Mine Road Project
- The Westside Mine Road Project was completed in October, 2001. This project comprised survey control, subdivision of new road, road closure and consolidation at Westside Mine, Killingworth. Ref: 14092
- Coal Haulage Road Project
- The Coal Haulage Road Project was completed in January, 1999. This project comprised survey and plan preparation for road Openings and Closures for realignment of road, for new bridges and the creation of easements in Stratum. Ref: 12386
- Water Supply and Pipeline Projects
- Wallalong Water Supply Trunk Mains Project
- The Wallalong Water Supply Trunk Project was completed in February, 2004. This project comprised the survey of approximately 7.5 kilometers of proposed water main. Ref: 14891
- Stockton to Shortland Wastewater Transfer Project
- The Stockton to Shortland Wastewater Transfer Project was completed in December, 2000. This project comprised approximately 15 kilometers of rising mains and variable grade sewer and two pumping stations. Ref: 13427
- Bolwarra - Farley Wastewater Transfer System Project
- The Bolwarra - Farley Wastewater Transfer System Project was completed in May, 1999. This project comprised a pumping station site survey and carrier/rising main surveys for approximately 9 kilometers. Ref: 13175
- Minmi-Maryland-Shortland Wastewater Transportation System Project
- The Minmi-Maryland-Shortland Wastewater Transportation System Project was completed in June, 1998. This project comprised a bypass survey for Minmi WWTW and Rising Main Survey from Maryland to Shortland Treatment Works (approximately 4 kilometers). Ref: 12501
- Nords Wharf to Swansea Sewage Transportation System Project
- The Nords Wharf to Swansea Sewage Transportation System Project was completed in February, 1997. This project comprised a survey of Rising Main and Carrier Main from Nords Wharf to Swansea (approximately 5 kilometers) and 2 pumping station sites. Ref: 11970
- Sewerage Projects
- Hunter Sewerage Project at Wyee Point
- The Hunter Sewerage Project at Wyee Point was completed in November, 2002. This project comprised Land Acquisition surveys for the Wyee Point Transportation System measuring approximately 120 kilometers. Ref: 14513
- Sewer Reticulation for Unsewered Lots at Medowie
- The project for Sewer Reticulation for Unsewered Lots at Medowie was completed in September, 2002. This project comprised the concept and detailed design of approximately 500 m of Reticulation sewer. Ref: 14254
- Sutton Park Estate - Sewer Reticulation & Transportation Project
- The Sutton Park Estate, Medowie - Sewer Reticulation and Transport Project was completed in July, 2001. This project comprised 1 pumping station and 25 kilometers of reticulation sewers. Also included the photogrammetric mapping of an existing development from which the detailed design work (by this firm) was completed. As a result of work completed under this assignment the firm featured in the N.S.W. 2000 Excellence in Surveying Awards picking up the Public Infrastructure and Community Facilities Award. Ref: N/A
- Karuah Sewerage Scheme Project
- Karuah Sewerage Scheme Project was completed in 2000. This project comprised 12.6 kilometers of Reticulation Sewers, 6.3 kilometers of Rising Main and 5 pumping stations. Ref: 13201
- Wyee Point Sewerage Scheme Project
- The Wyee Point Sewerage Scheme Project was completed in December, 1999. This project comprised 4.1 kilometers of reticulation sewers, pumping station and 7.4 kilometers of Rising Main. Ref: N/A
- Rafferty's Resort Sewerage Project
- The Rafferty's Resort Sewerage Project was completed in April, 1998. This project comprised 800 m of lead in Sewer mains to Cams Wharf No 1 Waste Water Pumping Station and water and sewerage Design for a 21 lot Community Title subdivision. Ref: N/A
- Proposed Sewer Mains - Workshop Place - Honeysuckle Cove
- The Proposed Sewer Mains - Workshop Place - Honeysuckle Cove was completed in July, 1997. This project comprised sewer extension design for a proposed marina development. Ref: N/A
- Cooranbong Sewerage Project
- The Cooranbong Sewerage Project was completed in January, 1997. This project comprised survey and design of 32½ kilometers of reticulation sewers and the survey for design of 10 pumping station sites and 10 rising mains. Ref: 11842
- Estelville Sewerage Scheme Project
- The Estelville Sewerage Scheme Project was completed on 19 July, 1995. This project comprised the survey and design of 1.78 kilometers of reticulation sewers and the survey for design of pumping station sites. Ref: N/A
- Morisset Central Work as Executed Survey Project
- The Morisset Central Work as Executed Survey Project was completed on 4 July, 1995. This project comprised the work-as-executed survey and preparation of digital plans during construction of 14.25 kilometers of reticulation sewers. Ref: N/A
- Sandgate Sewerage Reticulation & Carrier Main Project
- The Sandgate Sewerage Reticulation and Carrier Main Project was completed in March, 1995. This project comprised, inter alia, the survey and design of 750 metres of reticulation sewers. Ref: N/A
- Bonnells Bay Central Reticulation Survey & Design Project
- The Bonnells Bay Central Reticulation Survey and Design Project was completed in September, 1994. This project comprised the survey and design of 7 kilometers of reticulation sewers and rising mains. Ref: N/A
- Fishermans Bay Work as Executed Project
- The Fishermans Bay Work as Executed Project was completed for in April, 1994. This project comprised the work-as-executed survey and preparation of digital plans during construction of 320 metres of reticulation sewers. Ref: N/A
- Donnelly Road, Buttaba, Reticulation Survey & Design Project
- The Donnelly Road, Buttaba, Reticulation Survey and Design Project was completed in December, 1993. The project comprised the survey and design of 1,071 metres of sewer reticulation. Ref: N/A
- Woodford Area 6 of the Blue Mountains Backlog Project
- The Woodford Area 6 of the Blue Mountains Backlog Project was completed in February, 1991. The project comprised the survey and design of 425 metres of rising main and 2.327 kilometers of sewer reticulation. Ref: N/A
- Anna Bay Sewer Reticulation & Rising Mains Project
- The Anna Bay Sewer Reticulation and Rising Mains Project completed in December, 1990. This project comprised the survey for design and preparation of digital design plans of 11.4 kilometers of sewer reticulation. Ref: N/A
- Volumetric Surveys (Stockpiles & Earthworks)
- Bulk Earthworks at Karuah
- The Bulk Earthworks at Karuah was completed in January, 2000. This project comprised setout for bulk earthworks and 13 dwellings and a roadway on an Aboriginal Reserve at Karuah. Ref: 13491
- Stockpile Survey at Pasminco Shiploader
- The Stockpile Survey at Pasminco Shiploader was completed in January, 1996. This project comprised a Volumetric Survey at copper concentrate stockpile at the Pasminco shiploader. Ref: 11899
|
|
|